Scope: Structural & Foundation Works, Superstructure, Roofing, & Interior/Exterior Finishes



Building a resort on Tioman Island presented a dual challenge. First, the geotechnical conditions (sandy, coastal soil) required a specialized elevated footing design to ensure stability against tides and erosion. Second, the logistical nightmare of transporting materials to a remote island meant that any “over-design” or material wastage would cause critical delays and budget overruns.
Preventing Over-Design: We optimized the structural plan to use materials that were easily transportable yet durable enough for the corrosive sea air environment.
Alternative Engineering: We utilized an elevated beam and footing system to minimize earthworks and preserve the natural island topography.
Crisis Execution: To meet the tight resort opening deadline, our teams executed 24/7 construction shifts, including night-time concrete casting, ensuring the structural timeline was met despite island weather delays.
A structurally sound, aesthetically stunning resort delivered on time. The project transitioned seamlessly from heavy civil works to delicate architectural joinery, proving our capacity as a one-stop engineering partner.
Restore balance to your project. Whether you are facing a site crisis or planning a new township, 3 Nexus ECM Solutions is ready to engineer the solution.
+6012 - 345 6789 (Available for Emergency Site Assessments)
enquiry@3nexus.com
Johor Bahru, Kuala Lumpur & Peninsular Malaysia